基于地层尖灭的三维地质建模方法研究

    Research on 3D geological modeling method based on stratigraphic pinchout

    • 摘要: 城市地下空间的开发利用是当前城市建设的重要组成部分,而城市三维地质模型更是评价地下空间开发利用难度的基础之一。为了满足当前城市建设的需要,本文从模型精度的影响因素出发,设计了一种基于影响因素的地层尖灭位置合理计算方法。该方法通过考虑地层厚度、钻孔间距、地层埋深、单孔控制范围等因素,在追踪地层分区时确定尖灭位置,由此构建出精度更高的地层曲面,解决了三维地质建模中地层分区范围不准确的问题。本文以北海市为研究区域,使用钻孔、剖面等数据,建立统一地层层序,生成地层分区约束,建立北海市三维地质结构模型。为验证构建的模型是否可靠,本文基于钻孔和基于剖面的方式对模型质量展开评价。结果表明,该方法构建的三维地质模型与实际吻合度较高,可以处理含复杂地层的不整合地层的建模问题,具有一定的可信性。

       

      Abstract: The development and utilization of urban underground space is an important part of urban construction, and urban three-dimensional geological model is one of the bases to evaluate the difficulty of development and utilization of underground space. In order to meet the needs of current urban construction, this paper designs a reasonable calculation method of stratigraphic pinchout position based on the influencing factors of model accuracy. This method determines the pinchout position when tracking stratigraphic division by considering factors such as stratum thickness, borehole spacing, stratum burial depth, and single-hole control range, so as to construct a stratum surface with higher accuracy, and solve the problem of inaccurate stratigraphic division range in 3D geological modeling. In this paper, Beihai City is taken as the research area to establish a unified stratigraphic sequence, generate stratigraphic zoning constraints, and establish a three-dimensional geological structure model of Beihai City by using drilling and profile data. In order to verify the reliability of the constructed model, this paper evaluates the model quality based on drilling and profile. The results show that the three-dimensional geological model constructed by this method is highly consistent with the actual situation, which can deal with the modeling problem of unconformity strata containing complex strata and has certain credibility.

       

    /

    返回文章
    返回